electrical enginering now

Preklicano Objavljeno pred 5 letoma/leti Plačilo ob prevzemu
Preklicano Plačilo ob prevzemu

can divide the network into three areas/zones, and assume that loads at all

buses within a given zone behave the same way.

Hint: Consider using normalized load profiles for various areas in New York,

from the New York Independent System Operator website (do some research

on your own to find the data on the website. Consider using “load data” and

“charts” as key words). You can alternatively use the load profiles from Project

Run 24-hour simulations and report the voltage magnitude and losses at all

buses, and line loading through all branches.

Deliverable.

• Plot a 3D plot depicting the voltage magnitude at each bus over time.

• Plot another 3D plot depicting the percent line loading through each branch

throughout the day.

• Plot a 2D plot showing the total losses throughout the day at every bus, and

calculate the total losses across the entire network

Elektro inženiring Elektronika Inženiring

ID projekta: #16752045

Več o projektu

2 predlogov Oddaljen projekt Aktiven pred 5 letoma/leti