In MS Access Create a Form and Table that will allow the User to Create a Work Breakdown Structure (Tree)

  • Stanje: Closed
  • Nagrade: $190
  • Prejetih vnosov: 5
  • Zmagovalec/ka: NourElDeen

Navodila natečaja

In MS Access Create a Form and Table that will allow the User to Create a Work Breakdown Structure (Tree). I did this contest once before but allowed the winner to do it in .Net which was a mistake for me. THIS MUST BE IN ACCESS - VBA OR SQL I have an Attachment for more details

I added a second attachment that has more details to hopefully help you understand my needs.

Priporočene spretnosti

Delodajalčev feedback

“Yes I will absolutely hire again. Awesome work.”

Profilna slika gehyman22002, United States.

Najboljši vnosi tega natečaja

Poglej več vnosov

Javna tabla za pojasnila

  • newpast
    newpast
    • pred 5 let

    I Think you may #increaseprize

    • pred 5 let
  • newpast
    newpast
    • pred 5 let

    I am fluent in VBA and could build the Pure VBA version for you
    It will work on both 32 / 64 bit version of MS Access without any modification and no need for any installation or external lib
    The tree will be drown on text box or a list view that is a built in MS Access

    the fields you mentioned is not a meter and view both tchements

    • pred 5 let
  • newpast
    newpast
    • pred 5 let

    To make your needs
    We have two methods
    - Pure VBA - Access and will not give a nice view but will run out of box on any computer
    - Active X based and will give nice view

    the requirement you are explain is ok and could be make by the both methds

    • pred 5 let
  • gehyman22002
    Nosilec natečaja
    • pred 5 let

    Attached is an updated detailed explanation of what I need. See Rev 1 Attachment

    • pred 5 let
  • gehyman22002
    Nosilec natečaja
    • pred 5 let

    The Tree needs to have the "WBS" Number and the title (Description) Like entry number 6 but with number first and title next to it. Enty #5 looks very close to what I need, but it dosent show the title in the tree.

    • pred 5 let
  • freelancersree24
    freelancersree24
    • pred 5 let

    Please check my entry.

    • pred 5 let
  • gehyman22002
    Nosilec natečaja
    • pred 5 let

    Not what I am looking for. Please look at the Attachment for the contest. This is not MS Access Tree Function.

    • pred 5 let
    1. fuentro
      fuentro
      • pred 5 let

      I mentioned in my entry it wasn't exactly as the powerpoint but that the functionality was pretty much the same and I could work on something more like the PPT but needed your feedback

      • pred 5 let
  • fuentro
    fuentro
    • pred 5 let

    Please check out my entry and provide feedback if applicable.

    • pred 5 let

Pokaži več komentarjev

Kako začeti z natečaji

  • Objavi ta natečaj

    Objavi svoj natečaj Hitro in preprosto

  • Prejmi na tone vnosov

    Prejmi na tisoče vnosov S celega sveta

  • Dodeli natečaj najboljšemu vnosu

    Dodeli natečaj najboljšemu vnosu Prenesi datoteke - Preprosto!

Objavi natečaj zdaj ali pa pridruži se nam še danes!